Skip to product information
Part #: EPC-A-PL
Engineering-Ready Drone Site Assessments
$1,800.00
Includes a 3D 360 Degree Site Survey, Issue for Permit Engineering Drawings (up to 10 EVSE Ports) with Construction Estimate and Schedule. AHJ and Utility Coordination included. For up to 10 EVSE ports. Does NOT include V2X, Microgrid (i.e, Solar/ BESS/Controllers).